While I was working on the inwales, I was also able to get the material for the decks prepped and assembled. The following pictures show the decks ready for installation and finishing. As it sits right now, I only have the outwales and decks remaining; only four pieces of wood and the canoe is done!
To build the decks, I prepped the joint on the jointer with the angle to create the camber to the deck. Then I taped the joint and applied the thickened epoxy and more tape and a couple of clamps.
Tuesday, July 7, 2009
Subscribe to:
Post Comments (Atom)
Tape and clamps is all it takes.
This is one of the decks right after taping and clamping.
This shot shows the camber of the decks.
Here is one.
This is the other one. I think this one looks better.

No comments:
Post a Comment